One issue to understand is the contribution of the land cost to the project costs. The variables I have thought about considering are:
  • Net usable site (after dedicating land for the Almon St extension ROW
  • Net buildable site (after further deducting space inevitably lost to external circulation)
  • Gross Built space, after allowing for required parking. Parking could be under the building (at the cost of ground floor space and higher construction costs), but I don't know how to assess this yet.
  • Number of floors. The Overlay zone says minimum height 2 stories, and seems to say maximum height of 5 stories (but might be leaving open greater height with setbacks on upper stories)
Below is the spreadsheet I made with these variables. The Overlay Zone sets out the parking requirements, but its hard to estimate the parking without more detail of the program, so I took a guess.

What I see is that it takes quite intense development to get the land cost down below $10/sqft.

There are a couple commercial properties for sale in Moscow CBD right now with asking prices of about $100/sqft (land + structure). Construction costs run well over $90/sqft so there is something I'm missing or this land is greatly overpriced.

Site size (sqft)
184020
Net after ROW (sqft)
134014
Assumed Useable Footprint 90%
Net Footprint (sqft)
120613
Lost to public circulation 13401
Gross Built Footprint (not lost to parking)
60%
Numb Floors 4
Gross Built Space (SqFt) 361839
Land Cost $3,000,000
Land Cost/sqft built $10.36